Agencies » Calgary Transit
• 154-Hamptons
Jump to: Other Direction
Starting Saturday, May 23 through Saturday, June 13, from 9 a.m. to 3 p.m. on weekdays and 7 a.m. to 5 p.m. on Saturdays, there will be lane closures on 53 Street N.W. between Dalhurst Gate N.W. and John Laurie Boulevard N.W. for curb rehabilitation. Routes 54 77, 129 and 154 will have a stop closure.
The following stop will be temporarily closed:
- NB 53 ST N.W. @ Dalhurst GA (#3955) - Routes 54, 77, 129 and 154
Please use the following stop in lieu of the closed stop:
- NB 53 ST N.W. @ Dalhurst GA - 20m south of Dalhurst GA (nearside)
Effective immediately, and continuing until further notice, there is sidewalk and bus pad construction work on 53 Street N.W. between John Laurie Boulevard N.W. & Crowchild Trail N.W. Routes 54, 77, 129, 154 & 782 have stop closures.
The following stops are temporarily closed:
- NB 53 ST NW @ Dalhousie DR NW (#7625)
- NB 53 ST NW @ Dalhart DR NW (#4017)
- NB 53 ST NW @ Dalhurst GA NW (#3955)
- SB 53 ST NW @ Dalhart RD NW (#2427)
- SB 53 ST NW @ Dalhart RD NW (#7624)
Please use the following temporary stops in lieu of the closed stops:
- NB 53 ST NW @ Dalridge HL NW (near side)
- NB 53 ST NW @ Dalhart RD NW (near side)
- NB 53 ST NW @ just before the John Laurie BV road sign at Dalhurst GA)
- SB 53 ST NW @ Dalhart RD NW (10m north of the closed stop #2427)
- SB 53 ST NW @ Dalhart RD NW (near green utility stop south of the closed stop #7624)